Blog
Short guides for engineers and buyers, from the production floor.
Direct overseas supplier vs. a managed Israeli supplier: what is really in the price
A fair comparison between ordering directly from an overseas manufacturer and working with an Israeli supplier that manages production: what is in the price, where the risk is, and when each option is right.
First Article Inspection to AS9102: what it is, when it is required and what it saves
First Article Inspection (FAI) to AS9102: the three forms, when it is required and what it saves a manufacturer. A short guide from Rapido Production.
Chemical etching: when it beats laser, stamping and milling
What photochemical machining is, which parts it suits, its limits, and how to quote it correctly. A guide for mechanical and electronics engineers.
CNC machining to drawing: what really drives price and lead time
Seven things on a drawing that make a machined part expensive, and what to fix before you ask for a quote. A short guide for engineers and buyers.
Coatings and finishes for machined parts: what to write on the drawing to get what you wanted
Anodize, chem film, black zinc-nickel, electroless nickel, passivation and more. The military specs, REACH limits, and seven common mistakes in coating callouts.